Explore the best rated trails in Ware, MA, whether you're looking for an easy walking trail or a bike trail like the Bruce Freeman Rail Trail and Ashuelot Recreational Rail Trail . With more than 72 trails covering 664 miles you're bound to find a perfect trail for you. Click on any trail below to find trail descriptions, trail maps, photos, and reviews.
Nice new trail.Note that there is parking and a portapotty at the Parkinson Field Parking Lot in Sudbury. That's missing from the Traillink map.
Did the entire trail from Hinsdale to Keene and back.
First things first: the northernmost portion of the trail in Keene and Swanzey is lovely because it has been resurfaced and maintained. The rest was not fun at all, with short, smooth, pleasant patches followed by rocky, uneven patches with football-sized stones (and larger) protruding out of the trail surface. Plus, being November, the trail was completely obscured by fallen leaves, so it was impossible to see the downed limbs and protruding rocks until it was too late. So after all that bumping, my butt is really sore. At least I didn't get a flat on my hybrid's tires.
Segments: From Keene south halfway through Swanzey was excellent - 5 stars. But after about 6 miles of good riding the trail is closed for a mile or two thanks to several washouts. The detour is easy enough to navigate, but it, plus the remaining portion of Swanzey, are not worth the effort. After that, the surface is never good again.
South of Swanzey the trail abuts a power line for a few miles that is actively being refurbished, leaving the trail a rocky, sandy, uneven mess where the utilities have "repaired" the trail - miserable and uninteresting.
That leads you into Winchester, where there is apparently no trail maintenance being done at all, leading to single track and bumpy, where it's not muddy or sandy - miserable.
Trail along the river from Winchester to Hinsdale could be fun and interesting if the trail got some maintenance and repairs to the surface using something other than ballast stones. Fine for snowmobiles or walking, but not for bikes.
Finally, the trail south of the restored Hinsdale station gets progressively worse until ending at the parking lot for this and the Fort Hill Rail Trail.
So I won't be doing this trail again, and I can't recommend it either, despite the decent ratings some others have given it (probably after only doing portions).
I repeat do not use an e bike mountain bike only!!!!! We parked at Riverside road in Thompson CT trail head it’s hard packed the but not rocky etc after 4 miles we turned around to go back to car waste of time supposed to exit by town farm road doesn’t exist we ended up driving to brewery instead. Should be paved over would be 10x nicer we drive from Mass and avoided the northern most entrance w ballast rocks! This was just as bad, turn back or just don’t go Bike the road instead
So I started this trail in Portland, Connecticut, and about 3 to 4 miles into it. It stops at a marsh river area. There is no sign to tell you that it does or what detour to take. You would have to get on the main road to avoid this section. And the way people drive on that road I wouldn’t trust it. From what I heard, they were supposed to build a bridge over this section but said they were waiting for EPA to be involved which was years ago so I would highly recommend that you start in East Hampton for continued access.
We hoped to do the entire trail by parking in the middle just south of Keene. The signage going through town was minimal and included being on the road quite a bit. The south side noted “road closed” because it’s being paved, but the road dead ended after 2 miles.
Disappointed is an understatement.
A few too many crossings at the Leominster end, but its a fine trail. Last quarter mile or so on the Fitchburg end isnt so much a trail as it is street riding.
We rode from the parking lot at Quidnick St. in West Warwick to the abrupt end of the trail in Summit (Coventry), about 20 mi round trip. Pavement in very good shape. Trail is shaded for much of the way making for a pleasant ride. Lots of views of ponds, lakes, reservoirs and streams. Significant uphill climb to the end of the trail in Coventry but a screaming downhill for much of the way back. We plan to return in the fall, foliage will doubtless be stunning. Trail is paved throughout, and the western part of the trail is shared with equestrians, although sadly we did not see any.
This rider was going Northeast from Willimantic towards Hampton NOT Southwest from Willimantic to East Hampton. Having ridden both stretches I can say his description is completely wrong about the gorgeous and open riding Southeastern route and not completely wrong but somewhat overly harsh about his route which can get iffy for stretches.
Yes, the comments about all the root heaves along the paved trail are true, but otherwise a very attractive ride. The TrailLink description is very accurate. Might be special in foliage season.
Biked end to end today. Best described as two very different rail trails that are joined by a squirrelly connection.
Holliston (eastern) end is beautiful stone dust surface. It can be soft in places but is a terrific, well-maintained trail with excellent historical signage (think Casey at the Bat) and an unusually attractive short tunnel. Trail is long and straight and crosses several swampy water features chock full of flowers and wildlife. Sadly, the trail ends abruptly at the Holliston border with Sherborn with a short connector to a small parking lot.
The Holliston segment changes to pavement at the Milford town line and adds another mile or so to that segment. After that, there are a number of road crossings (some major) and sidewalks to make it to the main Milford rail trail.
The Milford segment is better described as a paved bike path that spends some time on a former railroad bed. The pavement is generally excellent, with only a few root heaves. It too is very attractive and an enjoyable ride as it winds through the woods and beside a lake. After an easier-than-expected crossing of the I-495 corridor, the trail continues north for another mile or so of rail trail until ending at the Hopkinton border.
All in all, each segment gets a 5 rating, each for very different reasons. The connection between the two is less interesting and makes the end-to-end experience less desirable. But credit where credit is due: Massachusetts drivers were invariably polite and respectful of the warning lights at all flashing road crossings. I'm not sure I could say the same about drivers in my home state.
If you are a dedicated mountain biker than this would be a 5 star. Don't do this trail if you don't have a mountain bike or those fat tires. I was on a mountain bike, and my son had a regular bike. The beginning of the trail is easy and lovely. Once you connect with the trail (beautiful water views) the trail becomes mostly rock with some sand. Passed 1.8 miles the trail is impassable with our bikes. Somehow we made it out and back without falls or bike damage. I have biked other ski trails that were more compacted sand and dirt with some rock. This is not that kind of trail.
TrailLink is a free service provided by Rails-to-Trails Conservancy (a non-profit) and we need your support!